A worker slips near the edge of a roof. The harness holds, and for a second everyone breathes out. Then the real question lands: what happens over the next few minutes, and who on site knows what to do?

A working at heights rescue plan answers that. It says who carries out the rescue, how they reach the person, what equipment they use and how fast it happens. All of it needs settling before anyone steps onto the roof. These are the five questions we ask on Melbourne sites, and they make a handy test for your own plan.

Who performs the rescue, and how fast can they get there?

Why waiting for emergency services is not a plan

Calling 000 is always the right move. It just isn’t a plan on its own. Crews still need to find the site, get through the building and reach the roof. Someone hanging in a harness can’t wait that long, so your site needs people who can start helping straight away.

Suspension trauma and why minutes matter

When a person hangs still in a harness, the leg straps can restrict blood flow. They may lose consciousness. This is called suspension trauma, sometimes known as harness hang syndrome. It’s why catching a fall doesn’t end the emergency. It starts a clock.

Safe Work Australia’s Model Code of Practice: Managing the risk of falls at workplaces is a good starting point, because it covers emergency planning where fall arrest systems are used. In Victoria, read it alongside the Occupational Health and Safety Act 2004 (Vic), the Occupational Health and Safety Regulations 2017 (Vic) and WorkSafe Victoria guidance.

Takeaway: write the names of your trained rescuers on the plan, along with a target response time. If nobody can meet that time, you need different equipment or different staffing.

What equipment makes a rescue possible on this roof?

A rescue is only as good as the gear fixed to the building. Some anchor points work well for clipping on but give a rescuer nothing to work with.

As installers, the gap we see most often on Melbourne roofs is an anchor placed for clipping on, with no thought for how someone would reach a person hanging below it. The fall arrest side looks fine on paper. The rescue side has never been tested. When we spot this, the usual fix is to move or add an anchor so the line runs short and a rescuer has a clear approach.

Anchor points and static lines that suit rescue as well as fall arrest

Where an anchor sits decides whether a rescuer can attach equipment and reach the person. A single point near the edge might catch a fall and still leave someone hanging where nobody can get to them.

Our page on anchor points that suit rescue as well as fall arrest covers the types we install. These include surface mount, concrete mount, Raptor Rails, Davit Plates and static lines. A static line is a cable fixed along the roof so a worker can stay clipped on while they move.

Davit Plates, fold down ladders and platforms

A Davit Plate gives you a mounting point for a davit arm, which is a small crane arm that helps with controlled recovery over an edge. Fold down and caged ladders give a fixed route up. Platforms give a level place to stand near plant. The table shows how this plays out in common situations.

Roof scenario

Risk if someone falls

Equipment that helps

Plant edge

Person hangs out of sight beside rooftop plant

Anchor placement that keeps the line short, Davit Plate for recovery

HVAC platform

Fall while stepping on or off the platform

Platform with handrails, fixed ladder access

Skylight area

Fall through or near a skylight, with a rescuer needing to approach the opening

Skylight covers, edge protection, safety signage

Ladder access

Worker stuck at the top of a ladder

Caged or fold down ladder with a proper landing

Takeaway: ask your installer whether the installed system supports recovery, not only stopping a fall.

Can a rescuer reach the person without becoming a second casualty?

Someone who rushes across an unprotected roof can easily become the next casualty. Plan the rescue route with the same care as the route the work takes.

Access routes under pressure

A hatch that suits one person climbing with a tool bag can be tight for two people carrying gear. Test your hatch access with the full kit in hand. Then look at the path to the plant. Marked walkways to plant and edges keep people clear of skylights and open edges.

A scenario we plan for: a fall beside rooftop plant

Picture a technician servicing a condenser unit on a Melbourne commercial building. The unit sits close to the edge. The technician falls, the anchor holds, and they end up hanging below the parapet, out of sight from the roof.

If the only route to the edge runs past skylights with no handrails, the rescuer is exposed from the first step. With a defined walkway and edge protection, they can reach the edge safely and get on with the job. This is a scenario for testing your plan, not a report of one particular job.

Takeaway: walk the route to the edge carrying the full kit, not just the tools for the job.

Is the plan written, specific to the site and practised?

A plan that lives in someone’s head isn’t a plan. At a minimum, yours should include:

  • Site address and roof access point
  • Roof layout, showing plant, skylights and edges
  • Anchor locations and types
  • The method and who carries it out
  • Emergency contacts, including 000 and the building manager
  • Where the equipment is stored
  • A review date

Why a generic template fails on a real roof

A template might say “lower the person to the ground”. Your roof may sit above a loading dock, a live car park or a laneway, where that simply can’t happen. A template also won’t know your hatch is tight or that one anchor sits behind plant.

Drills

Practise with the real equipment, on the real roof where you can, and with the people who would do the work. We won’t quote a drill interval here, because it depends on your site and your obligations. Review the plan whenever the layout, equipment or people change.

Who is responsible when contractors, tenants and building managers overlap?

On a shared building, several parties can hold duties at once under the Occupational Health and Safety Act 2004 (Vic). That can include employers, contractors and the people who manage or control the premises. “Someone else has it” is exactly how plans go stale. A qualified safety adviser can confirm who holds which duty on your building.

When a new trade starts, hand over the plan, walk the route with them and show them where the equipment is kept.

Takeaway: name one owner, keep one current copy and store it at the roof access point.

Frequently asked questions

What is a working at heights rescue plan?

It’s a written procedure for reaching and safely bringing down someone who has fallen or is stuck at height. It names the rescuers, method, equipment and contacts for that specific roof. It sits alongside fall prevention and doesn’t replace it.

Can we rely on 000 as our rescue plan?

No. Emergency services are your backup. Someone suspended in a harness needs reaching quickly, so your site should be able to start helping itself. Check the exact requirements against Safe Work Australia and WorkSafe Victoria guidance.

Do anchor points need to be designed with rescue in mind?

Yes. Location and type affect whether a rescuer can attach equipment and reach the person. Surface mount, concrete mount, Davit Plate and static line systems suit different roofs. Our anchor point installation page has the detail.

How often should a rescue plan be reviewed?

Review it whenever the roof layout, equipment, people or type of work changes, and put a review date on the plan. Check any fixed interval against the regulations and relevant standards.

Who writes the rescue plan for a roof on a shared building?

The duty holders for the site, usually the building owner or manager together with the contractors doing the work. One person should keep the current version and brief every new trade. A qualified safety adviser can confirm your specific obligations.

Conclusion

A rescue plan is only as good as the roof it was written for. The paperwork can be spotless and still fail if the anchor sits in the wrong place or the route to the edge is unprotected. Before your next job, have someone walk the roof and test the plan against what is actually installed.

Victorian Roof Access has completed 300+ projects across Melbourne, is ISO 45001 certified and has 10 Google reviews at 5.0. Contact us and we’ll review your anchor points, ladders, platforms and walkways before your next job.