A technician has to change a filter on a rooftop unit that sits a few metres from an unprotected edge. Is a harness enough? Not on its own. The hierarchy of control for working at heights ranks fall controls from most to least effective. You first try to remove the need to go up, then make the work area safe. Work positioning and fall arrest come next, and ladders, procedures and personal protective equipment (PPE) come last. We’ll walk through that order using one typical rooftop service job in Melbourne. You’ll see how each step changes what gets installed and what you ask contractors to do.

The hierarchy of control for working at heights, in plain terms

Think of it as a ranked list. You start at the top and only move down when the higher control isn’t reasonably practicable. That phrase means what a sensible person would do, given the size of the risk and the cost and effort of fixing it.

Victoria’s Occupational Health and Safety Act 2004 asks employers to eliminate risks so far as is reasonably practicable. Section 20 explains what that duty means. Where a risk can’t be eliminated, it must be reduced as far as is reasonably practicable. The Occupational Health and Safety Regulations 2017 add more detailed rules for work with a fall risk. The hierarchy shows what “reduce” should look like when the risk is a fall.

The order from most to least effective

Level

Control

Rooftop example

  • Eliminate or substitute

Move the task to ground level, or choose equipment that needs no climb

  • Safer work platforms and passive fall prevention

Handrailed walkways, guardrails, service platforms

  • Work positioning and fall arrest

Anchor points, static lines, harness

  • Ladders and administrative controls

Fixed ladders, permits, signage, training

The University of Wollongong’s roof safety survey for Building 40 sets out the hierarchy the same way. It uses an ordered table that starts with Eliminate.

People still need a way up, so ladders and hatches matter. They just aren’t where you stop.

Why a harness sits near the bottom of the list

A harness does not stop a fall. It limits the harm once someone has gone over the edge. It also relies on everything going right. You need a trained worker, a well fitted harness, a rated anchor and a rescue plan that works.

A guardrail protects everyone on site, including the person who forgets to clip on. NIOSH, the US workplace safety body, names elimination as the first control in its Hierarchy of Controls. That’s international guidance, not Australian regulation, but the logic carries across.

Why Victorian, NSW and overseas rules look so similar

Safe Work Australia’s model Code of Practice, Managing the risk of falls at workplaces, is the national reference. WorkSafe Victoria publishes its own guidance for Victorian sites. The UK’s Work at Height Regulations 2005 also call for planning, competent people and a hierarchy of control measures.

In 2026, changes to the NSW Work on Roofs Code of Practice came with advice that owners check their systems apply the fall control hierarchy, including where harnesses are used. That code applies in NSW only. Check Victorian requirements with WorkSafe Victoria before you rely on it.

A rooftop HVAC job, step by step

Here’s a typical job, built from the kinds of roofs we’re called to across Melbourne. We don’t share client details, so it’s a composite and not a single site. A three storey commercial building has a rooftop HVAC unit that needs regular filter changes and belt checks. The technician climbs a ladder, goes through a hatch and crosses the roof to the unit.

The hazard: unprotected edges and openings

Working near an edge, a floor opening or a stairwell without guardrails is a classic fall hazard. This building has two of them: the open edge beside the unit, and the hatch opening whenever the lid is up. Add a skylight on the walking route, and the technician passes three fall hazards just to change one filter.

When we walk a roof like this before quoting, the first thing we look at is the route, not the unit. We trace the path a technician actually takes, from the hatch to every item of plant. The hazards usually show up along that path.

Step one: can the climb be avoided at all?

Ask this before anything else. Can the filters be changed at ground level? Could the unit be moved, or swapped for one that can be serviced from a safe platform? Could remote monitoring cut the number of routine inspection visits?

If the answer is yes, the fall risk is gone rather than managed. More often the answer is no, because the plant is already in place. Then the job becomes making the building safe to work on.

Working down the hierarchy on that same roof

Safer work platforms: walkways, handrails and edge protection

Safe Work Australia guidance gives examples of safer work platforms. These include solid stairs with fixed handrails and properly installed guard rails around the edges.

On our example, that means a handrailed walkway from the hatch to the unit. It also means a handrailed platform at the unit itself. The technician walks, works and leaves without being exposed to an edge. See how this is done with roof walkways and handrails.

Safer access: fixed and fold down ladders and roof hatches

A fixed or caged ladder to a hatch, with the opening guarded, is far better than a portable ladder leaned against a parapet. The Kattsafe range we install includes fold down, caged and static line ladders. We also fit roof access hatches. Ladders rank lower because they get you there. They don’t protect you while you work.

Work positioning and fall arrest: anchor points and static lines

Some edges can’t take a guardrail. The structure may not carry the load, or rails might get in the way of the plant. In those cases a tested anchor point or static line lets the technician connect to the building. That keeps them clear of the edge, or arrests a fall if one happens.

We’re an approved supplier and installer of Kattsafe systems. These include surface mount and concrete mount anchor points, Davit Plates, Raptor Rails and static lines. Our page on roof anchor point installation explains how these are selected.

Administrative controls and PPE as the final layer

Permits, safety signage, training, a rescue plan and a properly fitted harness sit at the bottom. They matter, but they go on top of the controls above, not in place of them. On our example, signage at the hatch and a documented rescue plan cover what the platform and static line can’t.

How to check your own roof against the hierarchy

Five questions to ask before the next maintenance visit

  1. Does this task need to happen up there at all?
  2. Could the equipment or the task be moved somewhere safer?
  3. Is there a guarded route from the hatch to every item of plant?
  4. Where edge protection isn’t practical, is there a tested anchor system, and who inspects it?
  5. Is there a rescue plan, and does every contractor know it?

Write the answers down. A one page record that shows you asked these questions is useful if a contractor, insurer or inspector ever asks how you manage roof risk.

Common gaps we see on Melbourne roofs

  • Plant installed close to an edge with no platform or rail.
  • Anchor points with no inspection records, or no clear owner for inspections.
  • Hatch openings with nothing guarding them while open.
  • Skylights on walking routes with no cover or marked path.
  • Harnesses supplied, but no rescue plan.

Frequently asked questions

What is the hierarchy of control for working at heights?

It’s a ranked list of ways to manage fall risk, from most to least effective. Elimination comes first. Then come safer work platforms and passive fall prevention, then work positioning and fall arrest, then ladders and administrative controls. Australian work health and safety laws expect the highest level of control that is reasonably practicable.

Why is a harness the last resort and not the first choice?

A harness only limits the harm after a fall has happened. It depends on training, correct fitting, a rated anchor point and a rescue plan. Edge protection and safer platforms protect everyone without relying on individual behaviour.

Can a roof maintenance job really be done without working at heights?

Sometimes. You might move a filter change to ground level, monitor equipment remotely or choose plant that can be serviced from a platform. Where the work can’t be avoided, make the building safer before you reach for PPE.

Do guardrails count as a better control than anchor points?

Yes. Passive systems such as guardrails sit above personal fall arrest in the hierarchy. They aren’t always practical, for example where the structure can’t carry them or the edge isn’t accessible. That’s where anchor points and static lines fill the gap.

Does the NSW Work on Roofs Code of Practice apply in Victoria?

No. It’s a NSW document and doesn’t directly apply to Melbourne sites. The same fall control thinking applies across Australia, but Victorian duty holders should check current WorkSafe Victoria requirements.

How often should a building owner review fall controls?

Review whenever the site changes. That means new plant, a new maintenance contractor, a repair or an incident.

Fixed systems such as anchor points and static lines also need regular inspection by a competent person. AS/NZS 1891.4 covers the selection, use and maintenance of fall arrest equipment.

The exact interval depends on the manufacturer’s instructions and the tag on your system, so check those first. Keep a written record of every inspection, including the date, who did it and what they found.

Standards and references used

  • Occupational Health and Safety Act 2004 (Vic), section 20, and Occupational Health and Safety Regulations 2017 (Vic): the duty to eliminate or reduce risks so far as is reasonably practicable, and the detailed rules for fall risks.
  • Safe Work Australia, Managing the risk of falls at workplaces, model Code of Practice: examples of safer work platforms and the national approach to fall controls.
  • NSW Work on Roofs Code of Practice, 2026 changes: advice on applying the fall control hierarchy (NSW only).
  • Work at Height Regulations 2005 (UK): planning, competent people and a hierarchy of control measures.
  • NIOSH, Hierarchy of Controls: elimination as the first control.
  • AS/NZS 1891.4, Industrial fall arrest systems and devices: Selection, use and maintenance.
  • University of Wollongong, roof safety survey for Building 40: an ordered hierarchy table starting with Eliminate.

Get your roof access reviewed by people who install it

The hierarchy is really a way of asking better questions. Before you buy another harness, ask whether the climb can go. Then ask whether the surface can be made safe to walk on. Victorian Roof Access has completed 300+ projects across Melbourne, holds ISO 45001 certification for its Occupational Health & Safety Management System, and has a 5.0 rating from 10 Google reviews. Send us your site details and we’ll review your access against the hierarchy. We’ll then recommend only what the building needs.